Flooring

Each of the following projects shows a before (on the left) and after (on the right) shot. Click on either image to see larger and more images related to the project.

1/4 4/4

Marley Production Floor


Injection Moulding Area
Requirement:
Refurbishment coating to improve
Building
System Installed:
High build epoxy textured coating


1/2 2/2

Mitie Norwich


Dilapidations to large industrial unit Requirement:
Cost effective refurbishment coating
System Installed:
High build epoxy coating


1/2 2/2

Timberlaine Ind Est


Dilapidations to industrial unit Requirement:
Levelling of worn concrete floor
System Installed:
Flow applied 10mm cementitious screed


1/3 3/3

Triad Timber


Refurbishment to industrial unit Requirement: Re-profiling and coating of floor
System Installed:
Triad Timber
Cementitious screed and epoxy coating